The total length of the bridge is 841m and is divided into 3 parts. The 1st and 3rd part, concern the access bridges on the Greek and Turkish side, consisting of precast beams, with a length of 150.35 and 290.65m respectively. The main bridge, with a total length of 400m is a three-span (110m/180m/110m) extradosed bridge. Carriageway’s width is 34.5m and the height of the two pylons is 35m. It is the first extradosed bridge to be constructed in Greece.
Our role:
- Preliminary and Final Structural Design
- Geotechnical Design
- Hydraulic Design