The two footbridges are constructed about 500m apart and carry two footpaths over a dual carriageway. The total span of the bridges is 45m, the height of the arch is 7.50m and the width of the deck is 2.70m.
The deck is constructed as a steel-concrete composite section and is cast in-situ. The bridges are founded on a group of small diameter piles.
Our role:
- Final and Detailed Structural Design