The Scope of Works includes:
- 3 Overpasses
- 10 Underpasses
- 4 Bridges with lengths 69m, 141m, 177m and 785m
- 3 Tunnels with lengths 210m (S1-L), 240m (S1-R) and 280m (S1)
- 2 Cover& Cut structures, with lengths 330m and 210m
Our role:
- Preliminary and Final Structural Design of Overpasses, Underpasses, Bridges and C&C structures
- Preliminary and Final Structural Design of the final lining of Tunnels S1-L, S1-R and S1
- Preliminary and Final Structural Design of the portals of Tunnels S1-L, S1-R and S1
- Geotechnical Design of the Underground Excavation and Primary Support of Tunnel S1
- Hydraulic Design of all structures