Edessa Bypass – Cut & Cover Tunnel

Edessa Bypass – Cut & Cover Tunnel

The structure comprises two 10.00m wide sections and is 168.00m long. Each section provides two traffic lanes and one emergency footway. A two-lane trunk road, connecting two local villages is located over the tunnel.

The tunnel was constructed with the cut & cover method. The tunnel comprises 1.20m thick RC walls and is founded on 1.20m deep raft. The top section is semi-circular and is 1.00m thick.

 

Our role: 

  • Final Structural Design

BRING YOUR PROJECT DESIGNS
TO LIFE