The project covers the design of the drainage system for 15.00 km of the dual carriage way road between Chalkidona & Meslissi.
The drainage of the road is performed by constructing ditches and underground waste water grid consisting of pipes and manholes. A network of box type culverts and large diameter pipes conveys drainage water to nearby receivers.
Our role:
- Hydraulic Design