Ι.MAVRAKIS & PARTNERS S.A.
STRUCTURAL DESIGN OFFICE 

water fp2The project concerns the rainwater drainage of the road which joins Naousa with Skydra in Imathia. More specifically, the subjects under study are the drainage of the main and the service roads between 0+000 and 5+500km and the conveyance of the overflow water to appropriate receivers.

Read more...

melis 1The project covers the design of the drainage system for 15.00 km of the dual carriage way road between Chalkidona & Meslissi.

The drainage of the road is performed by constructing ditches and underground waste water grid consisting of pipes and manholes. A network of box type culverts and large diameter pipes conveys drainage water to nearby receivers.

Read more...