Ι.MAVRAKIS & PARTNERS S.A.
STRUCTURAL DESIGN OFFICE 

water fp1The irrigation network of the extended area of Koroneia Lake covers an area of about 14,000.00 hectares. It is divided into six closed sub-grids. Water supply comes from a network of 80 deep wells, with an average depth of drilling over 85.00m.
In order to cover water demand on high seasons, six regulative tanks per grid are constructed. Tanks' capacity varies from 1,500.00 to 5,600.00m3.

Read more...

water fp2The project concerns the rainwater drainage of the road which joins Naousa with Skydra in Imathia. More specifically, the subjects under study are the drainage of the main and the service roads between 0+000 and 5+500km and the conveyance of the overflow water to appropriate receivers.

Read more...

melis 1The project covers the design of the drainage system for 15.00 km of the dual carriage way road between Chalkidona & Meslissi.

The drainage of the road is performed by constructing ditches and underground waste water grid consisting of pipes and manholes. A network of box type culverts and large diameter pipes conveys drainage water to nearby receivers.

Read more...

kalik 2In the maritime area of Nea Kallikrateia, a windward and a leeward jetty were built in order to efficiently protect the port from undulations. The wave defense works are almost vertical to the main winds. The jetties are constructed using natural rocks of the wide area. The sea bed has been smoothened inside the protected area. Under the protection of some artificial boulders, alluvial deposits have appeared.

Read more...

Page 1 of 2