Ι.MAVRAKIS & PARTNERS S.A.
STRUCTURAL DESIGN OFFICE 

aerodr 1 copyThe total length of the Bridge is 80.90m consisting of 3 spans of 46.60m, 17.30m and 17.00m respectively. The deck comprises a voided slab which is prestressed in the longitudinal direction. Intermediate pies are formed as pairs of circular RC columns joined by a cross beam at the top. They are founded on small diameter piles.

Read more...

hangar 2 copyThe Hangar compound comprises four separate buildings. Buildings 1, 2 & 3 spring a total GEA of 4,608.00m2, 6,125.00m2 and 7,070.00m2 accordingly, divided over three storeys.

The Structural system comprises steel-concrete composite columns and solid flat slabs. 

 

Read more...

 

theatr 1

The building is an open-air venue with amfitheatrical shape that follows the existing natural slopes of the scenery. Structurally, it is divided in three separate parts: The upper and main sitting stand, the lower stand and the performance area with the changing rooms and support facilities.

Read more...

dim ther 1

The new Thermi City Hall consists of two main buildings with total GEA of 3,700.00 m2. The main structure houses a two storey underground parking covering the whole plan of the building. The underground parking is founded on a grillage of spread foundation beams. The surrounding RC shell is used to support earth pressures and provide waterproofing. The slabs of the building, due to the large

Read more...

Page 1 of 3